Wind projects in Turkey in 2009
Location |
Company |
Production date |
Turbine manufacturer |
Installed capacity (MW) |
Number of turbine and capacity |
Wind power plants under production energy |
|||||
İzmir-Зeşme |
Alize A.Ş. |
1998 |
Enercon |
1.50 |
3 Ч 500 kW |
İzmir-Зeşme |
Gьзbirliği A.Ş. |
1998 |
Vestas |
7.20 |
12 Ч 600 kW |
Зanakkale-Bozcaada |
Bores A.Ş. |
2000 |
Enercon |
10.20 |
17 Ч 600 kW |
İstanbul-Hadımkцy |
Sunjьt A.Ş. |
2003 |
Enercon |
1.20 |
2 Ч 600 kW |
Balıkesir-Bandırma |
Bares A.Ş. |
2006 |
GE |
30.00 |
20 Ч 1.500 kW |
İstanbul-Silivri |
Ertьrk A.Ş. |
2006 |
Vestas |
0.85 |
1 Ч 850 kW |
İzmir-Зeşme |
Mare A.Ş. |
2007 |
Enercon |
39.20 |
9 Ч 800 kW |
Manisa-Akhisar |
Deniz A.Ş. |
2007 |
Vestas |
10.80 |
6 Ч 1.800 kW |
Зanakkale-İntepe |
Anemon A.Ş. |
2007 |
Enercon |
30.40 |
38 Ч 800 kW |
Зanakkale-Gelibolu |
Doğal A.Ş. |
2007 |
Enercon |
14.90 |
13 Ч 800 kW + 5 Ч 900 kW |
Hatay-Samandağ |
Deniz A.Ş. |
2008 |
Vestas |
30.00 |
15 Ч 2.000 kW |
Manisa-Sayalar |
Doğal A.Ş. |
2008 |
Enercon |
30.60 |
38 Ч 800 kW |
İzmir-Aliağa |
İnnores A.Ş. |
2008 |
Norde |
42.50 |
17 Ч 2.500 kW |
İstanbul-GOP |
Lodos A.Ş. |
2008 |
Enercon |
24.00 |
12 Ч 2.000 kW |
İstanbul-Зatalca |
Ertьrk A.Ş. |
2008 |
Vestas |
60.00 |
20 Ч 3.000 kW |
Balıkesir-Şamlı |
Baki A.Ş. |
2008 |
Vestas |
90.00 |
38 Ч 3.000 kW |
Muğla-Datзa |
Dares A.Ş. |
2008 |
Enercon |
10.00 |
27 Ч 800 kW + 8 Ч 900 kW |
Capacity under operation |
|
|
|
433.35 |
|
Wind power plant under construction |
|||||
Aydın-Didim |
Ayen A.Ş. |
2009 |
Suzlon |
31.50 |
2.100 kW |
Hatay-Samandağ |
Ezse Ltd. Şti. |
2009 |
Nordex |
35.10 |
900 kW |
Hatay-Samandağ |
Ezse Ltd. Şti. |
2009 |
Nordex |
22.50 |
2.500 kW |
Osmaniye-Bahзe |
Rotor A.Ş. |
2009 |
GE |
135.00 |
54 Ч 2.500 kW |
İzmir-Зeşme |
Mazı-3 Res. A.Ş. |
2009 |
Nordex |
22.50 |
9 Ч 2500 kW |
İzmir-Зeşme |
Kores A.Ş. |
2009 |
Nordex |
15.00 |
1 Ч 2.500 kW |
Manisa-Soma |
Soma A.Ş. |
2009 |
Enercon |
140.80 |
176 Ч 800 kW |
Capacity under construction |
|
|
|
142.80 |
|
Projects with a turbine supply contract |
|||||
Balıkesir-Susurluk |
Alize A.Ş. |
2009 |
Enercon |
19.00 |